The German customer commissioned a third party to conduct a 3-day inspection and acceptance of the drill pipe.

24 Mar.,2021

On March 24, 2021, the third-party inspectors entrusted by the German customer conducted a detailed test on the drill pipe produced by the company. The test lasted for two days, and the final test results showed that all the tested products were qualified

 

On March 24, 2021, the third-party inspectors entrusted by the German customer conducted a detailed test on the drill pipe produced by the company. The test lasted for two days, and the final test results showed that all the tested products were qualified


The German customer commissioned a third party to conduct a 3-day inspection and acceptance of the drill pipe.