GRP Water Tank

17 Jun.,2022

Bio GRP Sectional Panel Water Tank SMC Water Tank

 

fibre glass water tank

Assembly of Bottom panel block Bottom Panel Block Assembly Sequence and Procedure 1) Attached the sealing tape to the flange for all of the bottom panel. 2) Method to Apply Tapes a) The sealing tape should be applied to all assembled flange surfaces. b) The centre side of the sealing tape should be overlapped by about 50mm (as shown in the below photo ) 3) To assemble a bottom panel block, fIrst connect several bottom panels into a sub-block. Determine the block size according to the site condition, the work space, number of workers, use or non-use of a crane, etc. A block that is too large cause difficulty in relocation and other work. Therefore, it is recommended that one block be limited to 10 panels x 2rows. 4) Arrangement and type of bottom panels. Place bottom panels one by one upside (as shown in Fig. 2). When installing a drain nozzle, place a pit panel in the pre-determined position. 5) Assembly of Drain Panel Using a hole saw(for a small bore),and a jigsaw(for large bore), th